Difference between revisions of "Template:LIMSpec for Cannabis Testing/Scheduled event management"
From CannaQAWiki
Jump to navigationJump to searchShawndouglas (talk | contribs) (Updated to 12.1 and added 12.6) |
Shawndouglas (talk | contribs) m (12.3) |
||
Line 12: | Line 12: | ||
|- | |- | ||
| style="padding:5px; width:500px;" |[https://www.law.cornell.edu/cfr/text/21/212.61 21 CFR Part 212.61 (a)]<br />[https://www.law.cornell.edu/cfr/text/21/211.166 21 CFR Part 211.166 (b)]<br />[https://www.astm.org/Standards/E1578.htm ASTM E1578-18 E-5-2] | | style="padding:5px; width:500px;" |[https://www.law.cornell.edu/cfr/text/21/212.61 21 CFR Part 212.61 (a)]<br />[https://www.law.cornell.edu/cfr/text/21/211.166 21 CFR Part 211.166 (b)]<br />[https://www.astm.org/Standards/E1578.htm ASTM E1578-18 E-5-2] | ||
| style="background-color:white;" |'''12.2''' The system scheduler shall be capable of working with a variety of laboratory tasks | | style="background-color:white;" |'''12.2''' The system scheduler shall be capable of working with a variety of laboratory tasks and experiments, such as calibrations, maintenance, and stability studies. | ||
|- | |- | ||
| style="padding:5px; width:500px;" |[https://www.astm.org/Standards/E1578.htm ASTM E1578-18 E-5-3] | | style="padding:5px; width:500px;" |[https://www.astm.org/Standards/E1578.htm ASTM E1578-18 E-5-3] |
Revision as of 23:35, 21 January 2021
|