Difference between revisions of "Template:LIMSpec for Cannabis Testing/Instrument and equipment management"
From CannaQAWiki
Jump to navigationJump to searchShawndouglas (talk | contribs) (Created as needed.) |
Shawndouglas (talk | contribs) (Text update) |
||
Line 55: | Line 55: | ||
[https://extranet.who.int/prequal/content/who-technical-report-series WHO Technical Report Series, #986, Annex 2, 13.5]<br /> | [https://extranet.who.int/prequal/content/who-technical-report-series WHO Technical Report Series, #986, Annex 2, 13.5]<br /> | ||
[https://extranet.who.int/prequal/content/who-technical-report-series WHO Technical Report Series, #986, Annex 2, 16.23] | [https://extranet.who.int/prequal/content/who-technical-report-series WHO Technical Report Series, #986, Annex 2, 16.23] | ||
| style="background-color:white;" |'''10.7''' The system shall allow for the configuration of calibration and maintenance frequency and time frames for—as well as the manual and automatic scheduling of calibration or maintenance of—equipment, instruments, and systems. Available intervals should | | style="background-color:white;" |'''10.7''' The system shall allow for the configuration of calibration and maintenance frequency and time frames for—as well as the manual and automatic scheduling of calibration or maintenance of—equipment, instruments, and systems. Available intervals should include days, weeks, months, and years. | ||
|- | |- | ||
| style="padding:5px; width:500px;" | | | style="padding:5px; width:500px;" | | ||
Line 71: | Line 71: | ||
[https://www.iso.org/standard/66912.html ISO/IEC 17025:2017 6.4.9]<br /> | [https://www.iso.org/standard/66912.html ISO/IEC 17025:2017 6.4.9]<br /> | ||
[https://extranet.who.int/prequal/content/who-technical-report-series WHO Technical Report Series, #986, Annex 2, 13.10] | [https://extranet.who.int/prequal/content/who-technical-report-series WHO Technical Report Series, #986, Annex 2, 13.10] | ||
| style="background-color:white;" |'''10.9''' The system shall clearly identify any instrument that is out-of-calibration, beyond its preventative maintenance due date, or under investigation | | style="background-color:white;" |'''10.9''' The system shall clearly identify any instrument that is out-of-calibration, beyond its preventative maintenance due date, or under investigation, while preventing it from being selected for use. | ||
|- | |- | ||
| style="padding:5px; width:500px;" | | | style="padding:5px; width:500px;" | |